Install & Validate
RFIDiQ Technician
Install & Validate
RFID field technicians who install, configure, tune, troubleshoot, and validate reader infrastructure under an engineer's released design
We recommend reading From Tag to Dashboard in full before attempting this exam — the training modules summarize its ideas, but the exam blueprint draws directly from the book. Get it on Amazon →
$299
Program fee
10-14 hours
Study time
70% / 90m
Pass score / time limit
None
Prerequisite
Curriculum
10 modules, each with a knowledge check before the next unlocks.
Module 1 · T01 · 60-75 minutes
RFID Technician's Role in Event Integrity
- Distinguish a tag observation from a supported business event.
- Identify the four framework elements in a field scenario.
- Explain which issues a technician corrects and which require escalation.
- Explain the engineer and technician survey roles and the installation handoff.
Module 2 · T02 · 90-105 minutes
RFID Hardware Fundamentals and Site Surveys
- Trace the power, RF, network, and trigger paths through a station.
- Identify the purpose of the main Gen2 memory banks.
- Record hardware characteristics that affect repeatability.
- Conduct and document the technician portion of an engineer-led site survey.
- Recognize the information required to release an installation package to another technician.
Module 3 · T03 · 90-105 minutes
Fixed Reader Installation from the Site Survey
- Bring a fixed reader into service using an approved configuration.
- Verify physical antenna mapping and observation output.
- Capture a restorable configuration baseline.
- Install from the released survey and resolve discrepancies through engineering.
- Produce an as-built record that another technician can use.
Module 4 · T04 · 75-90 minutes
Antennas and RF Behavior
- Explain why orientation and surroundings change observations.
- Compare one-variable RF adjustments using recorded trials.
- Choose a configuration based on inclusion and exclusion evidence.
Module 5 · T05 · 90 minutes
Controlled Read Zones
- Define an intended area and an explicit exclusion area.
- Apply the six-stage read-zone workflow.
- Demonstrate zone performance with boundary and challenge tests.
Module 6 · T06 · 75-90 minutes
Transition Portals
- Distinguish presence near a portal from completed passage.
- Verify physical geometry, triggers, and timing against the approved design.
- Test forward, reverse, and non-transition scenarios.
Module 7 · T07 · 75-90 minutes
Handheld RFID
- Prepare a handheld reader for an approved inventory or locate workflow.
- Control the mobile read zone during a search.
- Verify identity before any authorized memory operation.
Module 8 · T08 · 90 minutes
Commissioning and Tag Verification
- Execute the approved encode and verify workflow on a training tag.
- Detect mismatches and duplicate EPCs without hiding them.
- Record replacement and retirement through the approved lifecycle process.
Module 9 · T09 · 90-105 minutes
Troubleshooting
- Use a structured fault isolation sequence.
- Separate symptoms from supported causes.
- Verify repairs by repeating affected and neighboring tests.
Module 10 · T10 · 105-120 minutes
Validation and Documentation
- Distinguish configuration verification from outcome validation.
- Measure misses and false positives using explicit trial definitions.
- Produce a Technician Deployment Readiness Report with traceable evidence.
Exam blueprint
60 scenario and multiple-choice questions at full scale, weighted across the following domains.
| Domain | Weight | Target questions |
|---|---|---|
| RFID Technician's Role in Event Integrity | 10% | 6 |
| RFID Hardware Fundamentals and Site Surveys | 12% | 7 |
| Fixed Reader Installation from the Site Survey | 10% | 6 |
| Antennas and RF Behavior | 10% | 6 |
| Controlled Read Zones | 10% | 6 |
| Transition Portals | 8% | 5 |
| Handheld RFID | 8% | 5 |
| Commissioning and Tag Verification | 10% | 6 |
| Troubleshooting | 12% | 7 |
| Validation and Documentation | 10% | 6 |
Technician Deployment Readiness Report
Given an engineer-released survey and installation package on a faulted training station, inspect, configure, tune, troubleshoot, and validate the deployment, then submit a Technician Deployment Readiness Report documenting faults found and corrected, validation results, and a final readiness recommendation.
Submitted after passing the exam and reviewed by an admin before the certificate is issued.
Under review — check back soon.